Bolt Pre-tension Effect on Performance of Bolted Extended End-plate Moment Connections under Cyclic Loading

Document Type : Original Article

Authors

Faculty of Civil Engineering, Semnan University, Semnan, Iran

Abstract

The most important structural part of steel structures is the connections of the building frame. Tests conducted by the American Steel Institute have led to the introduction of prequalified connections, which is a good reference for designing connections in steel structures. In this paper, four bolted stiffened and unstiffened extended end-plate connections have been studied by numerical analysis with ABAQUS software. In this study, to examine the effect of bolt pre-tension rarely studied, a coefficient of pre-tension force, introduced based on the Iranian Steel Structures Design Regulations as well as the US Steel Design Regulations, has been considered. These connections have been modeled cyclically and in a displacement control manner. The cyclic behavior of the connections, dissipated energy, the resisting moment as well as the stress and strain distribution in the connection have been investigated. According to the results, by creating a pre-tension force in the bolts, the resisting moment of the connection would increase. The rate of growth of this resistance in the unstiffened connections was greater than that of the stiffened connections. The maximum increase in resistance was about 27% for the unstiffened connection and about 25% for the stiffened connection. The dissipated energy for the connections also increased with the increment of bolt pre-tension. The energy dissipation incremental rate was enhanced to a maximum of about 31% for the unstiffened connection and up to a maximum of about 24% for the stiffened connection.

Keywords

Main Subjects


  1. "Prequalified connections for special and intermediate steel moment frames for seismic applications", American Institute of Steel Construction, (2016).
  2. Murray, T.J.E.e.p.c., American institute of steel construction, "Aisc design guide series 4", American Institute of Steel Construction, , (1990).
  3. Astaneh-Asl, A., "Seismic design of bolted steel moment-resisting frames", Structural Steel Educational Council, Technical Information and Product Service(Steel Tips), , (1995).
  4. Jaspart, J.-P. and Maquoi, R., "Effect of bolt preloading on joint behaviour", in Proceedings of the First European Conference on Steel Structures., (1995), 219-226.
  5. Bahaari, M.R. and Sherbourne, A.N.J.J.o.S.E., "Finite element prediction of end plate bolted connection behavior. Ii: Analytic formulation", Vol. 123, No. 2, (1997), 165-175, doi: 10.1061/(ASCE)0733-9445(1997)123:2(165)
  6. Faella, C., Piluso, V. and Rizzano, G.J.J.o.S.E., "Experimental analysis of bolted connections: Snug versus preloaded bolts", Journal of Structural Engineering, Vol. 124, No. 7, (1998), 765-774, doi: 10.1061/(ASCE)0733-9445(1998)124:7(765)
  7. Adey, B., Grondin, G. and Cheng, J.J.J.C.J.o.C.E., "Cyclic loading of end plate moment connections", Canadian Journal of Civil Engineering, Vol. 27, No. 4, (2000), 683-701, doi: 10.1139/l99-080
  8. Sumner III, E.A., "Unified design of extended end-plate moment connections subject to cyclic loading, Virginia Polytechnic Institute and State University, (2003).
  9. Díaz, C., Martí, P., Victoria, M. and Querin, O.M.J.J.o.c.s.r., "Review on the modelling of joint behaviour in steel frames", Journal of Constructional Steel Research, Vol. 67, No. 5, (2011), 741-758, doi: 10.1016/j.jcsr.2010.12.014
  10. Gerami, M., Saberi, H., Saberi, V. and Daryan, A.S.J.J.o.C.S.R., "Cyclic behavior of bolted connections with different arrangement of bolts", Journal of Constructional Steel Research,, Vol. 67, No. 4, (2011), 690-705, doi: 10.1016/j.jcsr.2010.11.011
  11. Morrison, M., Quayyum, S. and Hassan, T.J.E.S., "Performance enhancement of eight bolt extended end-plate moment connections under simulated seismic loading", Engineering Structures, Vol. 151, (2017), 444-458, doi: 10.1016/j.engstruct.2017.08.040
  12. Guo, H., Xiao, F., Liu, Y. and Liang, G.J.J.o.C.S.R., "Experimental and numerical study on the mechanical behavior of q460d high-strength steel bolted connections", Journal of Constructional Steel Research, Vol. 151, (2018), 108-121, doi: 10.1016/j.jcsr.2018.09.012
  13. Elsabbgh, A., Sharaf, T., Nagy, S. and Elghandour, M., "Behaviour of extended end plate bolted connections subjected to monotonic and cyclic loads", Journal of Constructional Steel Research, Vol. 190, (2019), 142-159, doi: 10.1016/j.engstruct.2019.04.016
  14. Lyu, Y.-F., Li, G.-Q., Wang, Y.-B., Li, H. and Wang, Y.-Z.J.E.S., "Effect of bolt pre-tension on the bearing behavior of high strength steel connections", Engineering Structures,, Vol. 241, (2021), 112491, doi: 10.1016/j.engstruct.2021.112491
  15. Yee, Y.L. and Melchers, R.E.J.J.o.S.E., "Moment-rotation curves for bolted connections", Journal of Structural Engineering, Vol. 112, No. 3, (1986), 615-635, doi: org/10.1061/(ASCE)0733-9445
  16. Saberi, V., Gerami, M. and Kheyroddin, A.J.E.S., "Seismic rehabilitation of bolted end plate connections using post-tensioned tendons", Engineering Structures, Vol. 129, (2016), 18-30, doi: 10.1016/j.engstruct.2016.08.037
  17. "Recommended seismic design criteria for new steel moment frame buildings", Federal Emergency Management Agency, California Universities for Research in Earthquake Engineering, (2000).
  18. Iranian National Code of Design and Construction of Steel Structures, , No. 4, (2013).