%0 Journal Article %T Case Study in Increasing Overall Equipment Effectiveness on Progressive Press Machine Using Plan-do-check-act Cycle %J International Journal of Engineering %I Materials and Energy Research Center %Z 1025-2495 %A Jaqin, C. %A Rozak, A. %A Hardi Purba, H. %D 2020 %\ 11/01/2020 %V 33 %N 11 %P 2245-2251 %! Case Study in Increasing Overall Equipment Effectiveness on Progressive Press Machine Using Plan-do-check-act Cycle %K Total Productive Maintenance %K Availability %K Overall Equipment Effectiveness %K Plan-do-check-act Cycle %R 10.5829/ije.2020.33.11b.16 %X Press automotive components manufacturer in Indonesia with the Overall Equipment Effectiveness (OEE) achievement was 60.7%, it was below than world company level as mention in Japanese Institute of Plant Maintenance (JIPM)- Total Productive Maintenance (TPM) standard, the biggest OEE components problem was availability value that achieved 63.3%, then the biggest availability problem was dies preparation time. Using TPM method and Plan-Do-Check-Act (PDCA) cycle with Pareto chart and Fishbone diagram, we succeeded to improve dies setting time within one months. We could increase the availability value from 63.3% became 67.8% and finally OEE value increased from 60.7% became 65.3%. %U https://www.ije.ir/article_118850_358a7fd8b17833ecce118219a506f08d.pdf