An Extension to the Economic Production Quantity Problem with Deteriorating Products Considering Random Machine Breakdown and Stochastic Repair Time

Document Type : Original Article

Authors

Department of Industrial Engineering, Iran University of Science and Technology, Narmak, Tehran, Iran

Abstract

The recent advances in manufacturing systems motivate several studies to focus on Economic Production Quantity (EPQ) problem. Althuogh there are several extentions to the EPQ, this paper provides a new extension by considering some of the real world parameters like: (a) shortages in the form of partial backordering, (b) inventory can deteriorate stochastically, (c) machine can break down stochastically, and (d) machine repair time may change stochastically based on the failure status of machine. As far as we know, there is no study treated all these suppositions in an EPQ framework. In addition to this development, two forms of uniformly- and exponentially-distributed repair times are formulated and necessary convexity conditions are discussed. Then, the corresponding optimality conditions are written that lead to finding the roots of two equations. Due to difficulty of achieving a closed-form solution, the solution is obtained numerically by means of Newton-Raphson method. Finally, some sensitivity analyses are provided to explain the models’ applicability. The practicality and efficiency of the proposed method in this context lends weight to development of proposed EPQ with more complex elements and its application more broadly.

Keywords


1.     Safaeian, M., Fathollahi-Fard, A. M., Tian, G., Li, Z., and Ke, H., “A multi-objective supplier selection and order allocation through incremental discount in a fuzzy environment.” Journal of Intelligent & Fuzzy Systems, Vol. 37, No. 1, (2019), 1435-1455. https://doi.org/10.3233/JIFS-182843.  
2.     Misra, R.B., “Optimum production lot-size model for a system with deteriorating inventory.” International Journal of Production Research, Vol. 13, No. 5, (1975), 495–505. https://doi.org/10.1080/00207547508943019
3.     Kim, C.H., and Hong, Y., “An optimal production length in deteriorating production processes.” International Journal of Production Economics, Vol. 58, (1999), 183-189. https://doi.org/10.1016/S0925-5273(98)00119-4
4.     Samanta, G.P. & Roy, A., “A production inventory model with deteriorating items and shortages.” Yugoslav Journal of Operations Research, Vol. 14, No. 2, (2004), 219-230. https://doi.org/10.2004/00207547508943019
5.     Baten, M.A. and Kamil, A.A., “Optimal control of a production inventory system with generalized Pareto distributed deterioration items.” Journal of Applied Science, Vol. 10, (2010), 116-123.
6.     Yang, H.L., Teng, J.T. and Chern, M.S., “An inventory model under inflation for deteriorating items with stock-dependent consumption rate and partial backlogging shortages.” International Journal of Production Economics, Vol. 123, (2010), 8-19. https://doi.org/10.1016/j.ijpe.2009.06.041
7.     Mak, K.L., “Determining optimal production-inventory control policies for an inventory system with partial backlogging.” Computers & Operations Research, Vol. 14, No. 4, (1987), 299-304. https://doi.org/10.1016/0305-0548(87)90067-0
8.     Balkhi, Z.T., “The effects of learning on the optimal production lot size for deteriorating and partially backordered items with time varying demand and deterioration rates.” Applied Mathematical Modelling, Vol. 27, (2002), 763-779. https://doi.org/10.1016/S0307-904X(03)00081-7
9.     Lo, S.T., Wee, H.M., and Huang, W.C., “An integrated production-inventory model with imperfect production processes and Weibull distribution deterioration under inflation.” International Journal of Production Economics, Vol. 106, (2007), 248-260. https://doi.org/10.1016/j.ijpe.2006.06.009
10.   Cheung, L.L. and Hausman, W.H., “Joint determination of preventive maintenance and safety stocks in unreliable production environment,” Naval Research Logistics, Vol. 44, (1997), 257-272. https://doi.org/10.1002/(SICI)1520-6750(199704)44:3<257::AID-NAV2>3.0.CO;2-7
11.   Abboud, N.E., “A simple approximation of the EMQ model with Poisson machine failures.” Production Planning & Control, Vol. 8, No. 4, (1997), 385-397. https://doi.org/10.1080/095372897235190
12.   Arreola-Risa, A. and DeCroix, G.A., “Inventory management under random supply disruptions and partial backorders.” Naval Research Logistics, Vol. 45, (1998), 687-703. https://doi.org/10.1002/(SICI)1520-6750(199810)45:7<687::AID-NAV3>3.0.CO;2-7
13.   Giri, B.C., Yun, W.Y., and Dohi, T., “Optimal design of unreliable production–inventory systems with variable production rate.” European Journal of Operational Research, Vol. 162, (2005), 372-386. https://doi.org/10.1016/j.ejor.2003.10.015
14.   Chakraborty, T., Giri, B.C., and Chaudhuri, K.S. “Production lot sizing with process deterioration and machine breakdown.” European Journal of Operational Research, Vol. 185, (2008), 606-618.
15.   Chakraborty, T., Giri, B.C., and Chaudhuri, K.S., “Production lot sizing with process deterioration and machine breakdown under inspection schedule.” Omega, Vol. 37, No. 2, (2009), 257-271. https://doi.org/10.1016/j.ejor.2007.01.011
16.   Widyadana, G.A., and Wee, H.M., “Production inventory models for deteriorating items with stochastic machine unavailability time, lost sales and price-dependent demand.” Journal Teknik Industrial, Vol. 12, No. 2, (2010), 61-68.
17.   Widyadana, G.A. and Wee, H.M. “optimal deteriorating items production inventory models with random machine breakdown and stochastic repair time.” Applied Mathematical Modelling, Vol. 35, (2011), 3495-3508 https://doi.org/10.1016/j.apm.2011.01.006
18.   Chung, C.J., Widyadana, G.A. and Wee, H.M. “Economic production quantity model for deteriorating inventory with random machine unavailability and shortage.” International Journal of Production Research, Vol. 49, No. 3, (2011), 883-902. https://doi.org/10.1080/00207540903460232
19.   Chiu, Y.S.P. Chen, K.K. and Ting, C.K. “Replenishment run time problem with machine breakdown and failure in rework.” Expert Systems with Applications, Vol. 39, (2012), 1291-1297. https://doi.org/10.1016/j.eswa.2011.08.005
20.   Taleizadeh, A.A., Akhavan Niaki, S.T., and Najafi, A.A. “Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint.” Journal of Computational and Applied Mathematics, Vol. 233, (2010), 1834-1849. https://doi.org/10.1016/j.cam.2009.09.021
21.   Sarkar, B. “A production-inventory model with probabilistic deterioration in two-echelon supply chain management.” Applied Mathematical Modelling, Vol. 37, (2013), 3138–3151. https://doi.org/10.1016/j.apm.2012.07.026
22.   Chang H.C. “An analysis of production-inventory models with deteriorating items in a two-echelon supply chain.” Applied Mathematical Modelling, Vol. 36, (2013), 174-183. https://doi.org/10.1016/j.apm.2013.07.031
23.   Sarkar M., and B. Sarkar, “An economic manufacturing quantity model with probabilistic deterioration in a production system.” Economic Modelling, Vol. 31, (2013), 245-252. https://doi.org/10.1016/j.econmod.2012.11.019
24.   Sarkar, B., and S. Sarkar, “An improved inventory model with partial backlogging, time varying deterioration and stock-dependent demand.” Economic Modelling, Vol. 30, (2013), 924-932. https://doi.org/10.1016/j.econmod.2012.09.049
25.   Taleizadeh, A. A., “An EOQ model with partial backordering and advance payments for an evaporating item.” International Journal of Production Economics, Vol. 155, (2014), 185-193. https://doi.org/10.1016/j.ijpe.2014.01.023
26.   De, S. K., Goswami, A., and Sana, S. S., “An interpolating by pass to Pareto optimality in intuitionistic fuzzy technique for an EOQ model with time sensitive backlogging.” Applied Mathematics and Computation, Vol. 230, (2014), 664-674. https://doi.org/10.1016/j.amc.2013.12.137
27.   Khan, M., Jaber, M. Y., and Ahmad, A. R., An integrated supply chain model with errors in quality inspection and learning in production. Omega, Vol. 42, No. 1, (2014), 16-24. https://doi.org/10.1016/j.omega.2013.02.002
28.   De, S. K., and Sana, S. S., “Backlogging EOQ model for promotional effort and selling price sensitive demand-an intuitionistic fuzzy approach.” Annals of Operations Research, Vol. 233, No. 1, (2015), 57-76. https://doi.org/10.1007/s10479-013-1476-3.
29.   Palanivel, M., and Uthayakumar, R., “Finite horizon EOQ model for non-instantaneous deteriorating items with price and advertisement dependent demand and partial backlogging under inflation.” International Journal of Systems Science, Vol. 46, No. 10, (2015), 1762-1773. https://doi.org/10.1080/00207721.2013.835001
30.   Pal, S., Mahapatra, G. S., and Samanta, G. P., “A three-layer supply chain EPQ model for price-and stock-dependent stochastic demand with imperfect item under rework.” Journal of Uncertainty Analysis and Applications, Vol. 4, No. 1, (2016), 10-17. https://doi.org/10.1186/s40467-016-0050-3.
31.   Mohanty, D. J., Kumar, R. S., and Goswami, A., “A two-warehouse inventory model for non-instantaneous deteriorating items over stochastic planning horizon.” Journal of Industrial and Production Engineering, Vol. 33, No. 8, (2016), 516-532. https://doi.org/10.1007/s10479-017-2492-5.
32.   Chanda, U., and Kumar, A., “Optimisation of fuzzy EOQ model for advertising and price sensitive demand model under dynamic ceiling on potential adoption.” International Journal of Systems Science: Operations & Logistics, Vol. 4, No. 2, (2017), 145-165. https://doi.org/10.1080/23302674.2016.1151961
33.   Manna, A. K., Das, B., Dey, J. K., and Mondal, S. K., “Multi-item EPQ model with learning effect on imperfect production over fuzzy-random planning horizon.” Journal of Management Analytics, Vol. 4, No. 1, (2017), 80-110. https://doi.org/10.1080/23270012.2016.1217755
34.   Qiu, Y., Ni, M., Wang, L., Li, Q., Fang, X., and Pardalos, P. M., “Production routing problems with reverse logistics and remanufacturing.” Transportation Research Part E: Logistics and Transportation Review, Vol. 111, (2018), 87-100. https://doi.org/10.1016/j.tre.2018.01.009
35.   Marchi, B., Zanoni, S., Zavanella, L. E., and Jaber, M. Y. “Supply chain models with greenhouse gases emissions, energy usage, imperfect process under different coordination decisions.” International Journal of Production Economics, Vol. 211, (2019), 145-153. https://doi.org/10.1016/j.ijpe.2019.01.017
36.   Marchi, B., Zanoni, S., and Jaber, M. Y., “Economic production quantity model with learning in production, quality, reliability and energy efficiency.” Computers & Industrial Engineering, Vol. 129, (2019), 502-511. https://doi.org/10.1016/j.cie.2019.02.009
37.   Walid W. Nasr, and Jaber, M. Y., “Supplier development in a two-level lot sizing problem with non-conforming items and
 
learning”, International Journal of Production Economics, Vol. 216, (2019), 349-363. https://doi.org/10.1016/j.ijpe.2019.06.022
38.   Chen, B., Chao, X., and Ahn, H. S., “Coordinating pricing and inventory replenishment with nonparametric demand learning.” Operations Research, Vol. 67, No. 4, (2019), 1035-1052. https://doi.org/10.1287/opre.2018.1808
39.   Yang, P.C. and Wee, H.M., “A collaborative inventory system with permissible delay in payment for deteriorating items,” Mathematical Computer Modeling, Vol. 43, (2006), 209-221. https://doi.org/10.1016/j.mcm.2005.09.029
40.   Sana, S., S.K. Goyal, and K.S. Chaudhuri, “A production-inventory model for a deteriorating item with trended demand and shortages.” European Journal of Operational Research, Vol. 157, (2004), 357-371. https://doi.org/10.1016/S0377-2217(03)00222-4
41.   Saha, S., and Sen, N., “A study on inventory model with negative exponential demand and probabilistic deterioration under backlogging.” Uncertain Supply Chain Management, Vol. 5, No. 2, (2017), 77-88. https://doi.org/10.5267/j.uscm.2016.10.006.
42.   Pakhira, N., Maiti, M. K., and Maiti, M., “Two-level supply chain of a seasonal deteriorating item with time, price, and promotional cost dependent demand under finite time horizon.” American Journal of Mathematical and Management Sciences, Vol. 36, No. 4, (2017), 292-315. https://doi.org/10.1080/01966324.2017.1334605
43.   Fathollahi-Fard, A. M., Govindan, K., Hajiaghaei-Keshteli, M., and Ahmadi, A., “A green home health care supply chain: New modified simulated annealing algorithms.” Journal of Cleaner Production, Vol. 214, (2019), 118200. https://doi.org/10.1016/j.jclepro.2019.118200
44.   Fathollahi-Fard, A. M., Ranjbar-Bourani, M., Cheikhrouhou, N., and Hajiaghaei-Keshteli, M., “Novel modifications of social engineering optimizer to solve a truck scheduling problem in a cross-docking system.” Computers & Industrial Engineering, Vol. 137, (2019), 106103. https://doi.org/10.1016/j.cie.2019.106103
45.   Fathollahi-Fard, A. M., Hajiaghaei-Keshteli, M. and Tavakkoli-Moghaddam, R., “Red deer algorithm (RDA): a new nature-inspired meta-heuristic,” Soft Computing, (2020), https://doi.org/10.1007/s00500-020-04812-z.
46.   Fathollahi-Fard, A. M., Hajiaghaei-Keshteli, M., Tian, G., and Li, Z. “An adaptive Lagrangian relaxation-based algorithm for a coordinated water supply and wastewater collection network design problem.” Information Sciences, Vol. 512, (2020), 1335-1359. https://doi.org/10.1016/j.ins.2019.10.062
47.   Fathollahi-Fard, A. M., Ahmadi, A., Goodarzian, F., and Cheikhrouhou, N., “A bi-objective home healthcare routing and scheduling problem considering patients’ satisfaction in a fuzzy environment.” Applied Soft Computing, Vol. 93, (2020), 106385. https://doi.org/10.1016/j.asoc.2020.106385
48.   Hajiaghaei-Keshteli, M., and Sajadifar, S. M., “Deriving the cost function for a class of three-echelon inventory system with N-retailers and one-for-one ordering policy.” The International Journal of Advanced Manufacturing Technology, Vol. 50, No. 1-4, (2010), 343-351. https://doi.org/10.1007/s00170-009-2486-9
49.   Hajiaghaei-Keshteli, M., Sajadifar, S. M., and Haji, R., “Determination of the economic policy of a three-echelon inventory system with (R, Q) ordering policy and information sharing. The International Journal of Advanced Manufacturing Technology, Vol. 55, No. 5-8, (2011), 831-841. https://doi.org/10.1007/s00170-010-3112-6.