1. Zegordi, S. H., and Nahavandi, N., “Measuring productivity indexes and efficiency in the container terminal at port Rajaei”, Scientia Iranica, Vol 9, No. 3, (2002), 248-254.
2. UNCTAD, “Review of maritime transport 2018”. United Nations Conference on Trade and Development, (2018). https://doi.org/10.18356/cd4440fc-en
3. Daganzo, C. F., "The crane scheduling problem", Transportation Research Part B: Methodological, Vol. 23, No. 3, (1989), 159-175. https://doi.org/10.1016/0191-2615(89)90001-5
4. Kim, K. H., Park, Y. M., "A crane scheduling method for port container terminals", European Journal of Operational Research, Vol 156, No. 3 (2004), 752-768. https://doi.org/10.1016/s0377-2217 (03)00133-4
5. Moccia, L., Cordeau, J. F., Gaudioso, M., Laporte, G. "A branch‐and‐cut algorithm for the quay crane scheduling problem in a container terminal", Naval Research Logistics, Vol 53, No. 1 (2006), 45-59. https://doi.org/10.1002/nav.20121
6. Nguyen, S., Zhang, M., Johnston, M., Tan, K. C. "Hybrid evolutionary computation methods for quay crane scheduling problems." Computers and Operations Research, Vol. 40, No. 8 (2013), 2083-2093. https://doi.org/10.1016/j.cor.2013.03.007
7. Kaveshgar, N., Huynh, N., Rahimian, S. K., "An efficient genetic algorithm for solving the quay crane scheduling problem", Expert Systems with Applications, Vol. 39, No. 18, (2012), 13108-13117. https://doi.org/10.1016/j.eswa.2012.05.091
8. Tavakkoli-Moghaddam, R., Makui, A., Salahi, S., Bazzazi, M., Taheri, F., "An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports", Computers and Industrial Engineering, Vol. 56, No. 1 (2009), 241-248. https://doi.org/10.1016/j.cie.2008.05.011
9. Emde, S. "Optimally scheduling interfering and non‐interfering cranes", Naval Research Logistics, Vol. 64, No. 6, (2017), 476-489. https://doi.org/10.1002/nav.21768
10. Sammarra, M., Cordeau, J. F., Laporte, G., Monaco, M. F., "A tabu search heuristic for the quay crane scheduling problem", Journal of Scheduling, Vol 10, No. 4-5 (2007), 327-336. https://doi.org/10.1007/s10951-007-0029-5
11. Legato, P., Trunfio, R., & Meisel, F. “Modeling and solving rich quay crane scheduling problems” Computers and Operations Research, Vol. 39, No. 9, (2012), 2063-2078. https://doi.org/10.1016/j.cor.2011.09.025
12. Chen, J. H., Bierlaire, M., “The study of the unidirectional quay crane scheduling problem: complexity and risk-aversion. European”, Journal of Operational Research, Vol. 260, No. 2, (2017), 613-624. https://doi.org/10.1016/j.ejor.2017.01.007
13. Bierwirth, C., Meisel, F., "A survey of berth allocation and quay crane scheduling problems in container terminals", European Journal of Operational Research, Vol 202, No. 3 (2010), 615-627. https://doi.org/10.1016/j.ejor.2009.05.031
14. Bierwirth, C., Meisel, F., "A follow-up survey of berth allocation and quay crane scheduling problems in container terminals", European Journal of Operational Research, Vol. 244, No. 3 (2015), 675-689. https://doi.org/10.1016/j.ejor.2014.12.030
15. Chen, L., Bostel, N., Dejax, P., Cai, J., & Xi, L. "A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal", European Journal of Operational Research, Vol 181, No. 1 (2007), 40-58. https://doi.org/10.1016/j.ejor.2006.06.033
16. Tang, L., Zhao, J., & Liu, J. "Modeling and solution of the joint quay crane and truck scheduling problem." European Journal of Operational Research, Vol 236, No. 3, (2014), 978-990. https://doi.org/10.1016/j.ejor.2013.08.050
17. Kaveshgar, N., & Huynh, N. "Integrated quay crane and yard truck scheduling for unloading inbound containers." International Journal of Production Economics, Vol 159 (2015), 168-177. https://doi.org/10.1016/j.ijpe.2014.09.028
18. Vahdani, B., Mansour, F., Soltani, M., & Veysmoradi, D. "Bi-objective optimization for integrating quay crane and internal truck assignment with challenges of trucks sharing." Knowledge-Based Systems, Vol 163, (2019), 675-692. https://doi.org/10.1016/j.knosys.2018.09.025
19. Fazli, M., Fathollahi-Fard, A. M., Tian, G., “Addressing a Coordinated Quay Crane Scheduling and Assignment Problem by Red Deer Algorithm”, International Journal of Engineering, Transactions B: Applications, Vol. 32, No. 8, (2019), 1186-1191.
https://doi.org/10.5829/ije.2019.32.08b.15
20. Behjat, S., & Nahavandi, N. “A Mathematical Model and Grouping Imperialist Competitive Algorithm for Integrated Quay Crane and Yard Truck Scheduling Problem with Non-crossing Constraint” International Journal of Engineering, Transcation A: Basics, Vol. 32, No. 10, (2019), 1464-1479. https://doi.org/10.5829/ije.2019.32.10a.16
21. Pinedo, M. Scheduling. New York: Springer, 2012. https://doi.org/10.1007/978-1-4614-2361-4
22. Kirkpatrick, S., Gelatt, C. D., Vecchi, M. P. “Optimization by simulated annealing”, Science, Vol. 220, No. 4598, (1983), 671-680. https://doi.org/10.1126/science.220.4598.671
23. Nikabadi, M., & Naderi, R. “A hybrid algorithm for unrelated parallel machines scheduling.” International Journal of Industrial Engineering Computations, Vol. 7, No. 4, (2016), 681-702. https://doi.org/10.5267/j.ijiec.2016.2.004
24. Kashan, A. H., Kashan, M. H., Karimiyan, S. "A particle swarm optimizer for grouping problems." Information Sciences, Vol. 252, (2013), 81-95. https://doi.org/10.1016/j.ins.2012.10.036