1. Nourali, H., Osanloo, M., "A New Cost Model for Estimation of Open
Pit Copper Mine Capital Expenditure", International Journal of
Engineering, Transactions B: Applications Vol. 32, No. 2, (2019),
184-191.
2. Mula, J., Poler, R., Garcia-Sabater, J. and Lario, F.C., "Models for
production planning under uncertainty: A review", International
Journal of Production Economics, Vol. 103, No. 1, (2006), 271-285.
3. Vallee, M, "Mineral resource + engineering, economic and legal
feasibility = ore reserve", Canadian Mining and Metallurgy Society
Bulletin Vol. 93, (2000), 53–61.
4. Jamshidi M, Osanloo M., "Reliability analysis of production schedule
in multi-element deposits under grade-tonnage uncertainty with multidestinations
for the run of mine material". International Journal of
Mining Science and Technology (2018).
https://doi.org/10.1016/j.ijmst.2018.04.016.
5. Groeneveld, B., Topal, E., "Flexible open-pit mine design under
uncertainty", Journal of Mining Science, Vol. 47, No. 2, (2011), 212226.
6. Rahmanpour, M., and M. Osanloo. "Resilient decision making in
open pit short-term production planning in presence of geologic
uncertainty." International Journal of Engineering, Transactions
A: Basics, Vol. 29, No. 7 (2016), 1022-1028.
7. Montiel, L., Dimitrakopoulos, R., " A heuristic approach for the
stochastic optimization of mine production schedules", Journal of
Heuristics, Vol 23, (2017), 397–415, DOI 10.1007/s10732-017-93496.
8. Azimi, Y., Osanloo, M. and Esfahanipour, A., "An uncertainty based
multi-criteria ranking system for open pit mining cut-off grade
strategy selection", Resources Policy, Vol. 38, No. 2, (2013), 212-223.
9. Gholamnejad, J., Osanloo, M. and Khorram, E., "A chance
constrained integer programming model for open pit long-term
production planning", International Journal of Engineering,
Transactions A: Basics, Vol. 21, No. 4, (2008), 307-318.
10. Popover, G. (1971). The working of mineral deposits (Translated
from the Russian by Shiffer, V.). Mir publishers, Moscow, (1968),
458-461.
11. Soderberg, A., Rausch, D.O. Surface Mining (Section 4.1). Pfleider,
E.P., (ed.). AIMM, New York. 142–143.
12. Chen J. Li, J., Luo, Z., Guo, D. Development and Application of
Optimum Open-Pit Limits Software for the Combined Mining of
Surface and Underground. CAMI, (2001), 303−306.
13. Chen, J., Guo, D., Li, J. Optimization Principle of Combined Surface
and Underground Mining and Its Applications. Journal of Central
South University of Technology, Vol. 10, No. 3, (2003), 222−225.
14. Bakhtavar, K. Shahriar, K., Mirhassani A. Optimization of the
Transition from Open Pit to Underground Operation in Combined
Mining Using (0-1) Integer Programming. Journal of the Southern